Thursday, 25 December 2008
New rubbing rail going on ....50 *25 mm Iroko 26 ' long with centre splice that was done off the boat with epoxy. Rail then fixed to hull with 60 6mm bolts per side. No steaming was required.... just started at the bow and worked slowly aft drilling and fitting the bolts as we go . Very pleased with the results, makes the boat seem young again.


Sunday, 21 December 2008
Head lining
Sunday, 14 December 2008
Saturday, 6 December 2008
Ready for a new paint Job!
Friday, 5 December 2008
Our Matrona Maris a 1965 Westerly 25
Here is our first attempt at a blog to promulgate to all interested, our latest renovation Project. Two years ago we sold our beloved Westerly Konsort Duo and moved South from Scotland to Knott end on Sea, Lancashire. After owing various yachts over the past 30 years, withdrawal symptom's were becoming acute to the extent that we purchased a much unloved 1965 westerly 25, found in the long grass at nearby Wardleys yacht club.
Matrona Maris (sea wife) I think!, had not been in the water for 7 years and was in much need of TLC after a good steam clean and wash. The boat is in good structural order built like a tank with no balsa core but solid GRP decks. The Westerly 25 was the first Westerly to cross the Atlantic in 1966. Matrona is number 81 of 130 built before the model was changed to the Windrush and the the centaur.
Thanks to a previous owner the boat has been fitted with a Vetus M2.04 11 hp diesel and despite no use for Severn years, starts and runs perfect. The main tasks before launch in April 2009 are ....
1.Strip off 13 layers of paint on the hull,undercoat and re paint Navy Blue.
2.Replace all the rubbing strake with Iroko
3.Scrape all paint of decks and cabin roof and re paint with non slip
4.Make good all wood work and GRP cracks and crazes
5.replace standing and running rigging
6.re design interior by opening out bulkheads and relocating cooker to Starboard side
7.Fitting headling and side carpets to both cabins and bunks
8. Epoxy coat the underwater hull and antifoul.
As of 10 December items 1,2,6 and 7 are mostly completed